XTD Steel Factory Network

Suzhou FACTORY

Our Suzhou Manufacturing Base is strategically located in the heart of the Yangtze River Delta, within Zhenze Industrial Development Zone in Wujiang City, Suzhou. Spanning across 87,000 square meters, our facility is home to a dedicated team of over 200 skilled professionals, operating in five state-of-the-art production factories. With a comprehensive range of advanced manufacturing equipment and six fully integrated steel structure production lines, we have the capability to process a wide range of products including heavy steel, light steel, truss frames, and pipe support systems. Our company boasts an autonomous system encompassing design, engineering, manufacturing, and complete end-to-end solutions, ensuring seamless and comprehensive services for our clients.

Yichun FACTORY

Our Yichun Manufacturing Base is strategically located in Yifeng Industrial Development Zone, at the geographical center of the Central Triangle Economic Circle. This advantageous location enables us to serve as a hub with excellent connectivity, forming a 2-hour transportation radius that encompasses Nanchang, Changsha, and Wuhan, the three provincial capital cities. Spanning across an expansive area of 82,000 square meters, Our park has successfully completed the first phase, and the operational factory now spans 33,000 square meters. With a dedicated workforce of nearly 100 skilled professionals, we have established three heavy steel production lines, two light steel production lines, one net frame production line, and one pipe support system production line. Our truss car has a maximum lifting capacity of 32 tonnes. With an annual production capacity of over 50,000 tonnes, we are committed to delivering high-quality steel structure components.

Guangzhou FACTORY

The Guangzhou Processing Base is located at the southernmost end of Guangzhou City, situated at the mouth of the Pearl River. It serves as the only gateway for Guangzhou to the ocean and acts as a pivotal hub connecting the cities on both sides of the Pearl River Delta. With an area of nearly 10,000 square meters, the park is equipped with three complete steel structure processing production lines, providing integrated services including design, processing, and installation for Clients in South China.

Location Information
Why Zipcode

Knowing where you plan on building is essential to providing an accurate building estimate.

Search