Pedestrian Overpass Project Details
Located in the heart of Shanghai’s Taopu Smart City, the Pedestrian Overpass stands as a striking example of innovation, sustainability, and modern urban connectivity. Designed and constructed by XTD Steel, this curved space truss structure showcases the fusion of advanced engineering and architectural artistry, redefining what a modern urban overpass can be.
Completed in 2020, the project marks a major milestone in Taopu’s transformation into a smart city hub, setting new standards for both functional design and structural excellence.
The Pedestrian Overpass of Taopu Smart City
The Pedestrian Overpass was envisioned as a signature feature of Taopu Smart City — a bridge that not only connects urban zones but also serves as a visual symbol of the district’s forward-thinking vision. Unlike conventional walkways, it embodies both utility and beauty, seamlessly integrating transportation efficiency with aesthetic sophistication.
As part of Shanghai’s expanding smart infrastructure, this overpass was designed to promote eco-friendly mobility, improve pedestrian flow, and enrich the city’s urban landscape. Its curved architectural form and open spatial configuration make it one of the most distinctive modern pedestrian overpasses in Shanghai, admired for its balance of elegance and engineering precision.
Project Scale and Construction Details
Covering a total construction area of 81,000㎡, the Pedestrian Overpass Project represents one of the largest and most technically demanding pedestrian infrastructure works in the region.
The above-ground section, spanning approximately 54,000㎡, accommodates wide pedestrian walkways, viewing platforms, and rest zones designed for both functionality and visual experience. Meanwhile, the 27,000㎡ underground section integrates technical utilities, support rooms, and access connections to nearby transit systems — ensuring seamless integration with Taopu Smart City’s transport network.
This thoughtful distribution between above-ground and underground zones enhances both structural stability and space efficiency, while maintaining a sleek, modern design that harmonizes with the city’s overall smart development aesthetic.
Curved Space Truss Structure: Engineering Innovation in Motion
At the core of the Pedestrian Overpass lies its defining engineering feature — the curved space truss steel structure. This advanced structural system provides exceptional strength, flexibility, and visual fluidity, enabling the bridge to achieve its unique sweeping design while maintaining superior durability and safety.
Unlike traditional beam or arch frameworks, the curved space truss design allows for long-span crossings and column-free interiors, enhancing both aesthetic impact and pedestrian comfort. The result is an overpass that feels light and dynamic yet possesses extraordinary load-bearing capacity and stability.
This integration of architectural form and structural logic represents the perfect synergy between design and engineering, positioning the Pedestrian Overpass at Taopu Smart City as a global example of innovative steel structure application.
Completion and Urban Impact
Since its completion in 2020, the Pedestrian Overpass has become a defining feature of Taopu Smart City and a new urban attraction in Shanghai. Its innovative structure and energy-efficient design have positioned it as a model project within China’s smart city infrastructure development.
Beyond functionality, the overpass plays an important social role — linking residential, commercial, and cultural zones while providing safe, accessible passage for thousands of daily commuters. The structure also enhances the aesthetic skyline of Taopu, drawing visitors, photographers, and urban planners who recognize its symbolic value as a modern architectural landmark.
Symbol of Sustainability and Smart Connectivity
The Pedestrian Overpass embodies the principles of sustainability and smart urban planning that define Taopu Smart City. Its steel space truss structure allows for material efficiency, long service life, and reduced environmental impact.
Energy-efficient LED lighting, anti-corrosion coatings, and rainwater management systems were integrated to ensure minimal maintenance and operational sustainability. The project not only improves pedestrian safety but also reflects Shanghai’s broader vision of green mobility and digital urbanization.
Through its design, the overpass demonstrates how modern infrastructure can combine technological innovation, environmental responsibility, and urban beauty — turning a practical crossing into a piece of architectural art.
Inspiring Future Pedestrian Overpass Designs
The success of the Pedestrian Overpass at Taopu Smart City has inspired future infrastructure projects across Shanghai and beyond. Its bold curved geometry and space truss construction have redefined the possibilities for pedestrian bridge design, proving that utility and artistry can coexist in perfect balance.
For architects, engineers, and city planners, it serves as a case study in structural innovation and sustainable urban mobility. By integrating design aesthetics with practical performance, it points the way toward a new generation of pedestrian overpasses that enrich both the visual and functional fabric of modern cities.
Standing as a true landmark of Shanghai’s smart infrastructure, the Pedestrian Overpass is more than an elevated walkway — it is a statement of progress. With its curved space truss structure, large-scale integration, and commitment to sustainability, it sets a new benchmark for future pedestrian overpass projects that blend culture, technology, and structural excellence.



