High-Rise Building | Shanghai Bankcard Industrial Park Lot 8 Steel Structure Assembly Building

Location: Shanghai

Building area: about 201,600 m2

Ground area: about 151,600 m2

Basement area: about 50,000 m2

Steel structure type: steel structure concrete high-rise

Completion time: 2025

High-Rise Building Details

The high-rise building in Shanghai, scheduled for completion in 2025, represents one of the most ambitious large-scale developments in the city’s rapidly evolving skyline. Designed as a steel structure concrete high-rise, this landmark project reflects the growing demand for innovative and efficient commercial spaces in one of China’s most dynamic business hubs. With a total building area of approximately 201,600㎡, the development emphasizes scale, functionality, and forward-looking architectural vision.

Project Overview

Strategically located in Shanghai, a city globally recognized for its financial and commercial influence, this high-rise building is designed to meet the diverse needs of international corporations, regional enterprises, and growing startups. The structure covers a ground area of about 151,600㎡, ensuring expansive space for high-end corporate offices, meeting rooms, and multifunctional business environments.

In addition, the project includes a basement area of approximately 50,000㎡, offering underground parking, technical service areas, storage facilities, and space for employee amenities. This design maximizes usable land while ensuring that the surface levels remain dedicated to office, commercial, and public engagement functions.

Architectural and Structural Excellence

The steel structure concrete high-rise approach chosen for this project highlights its commitment to strength, flexibility, and safety. Steel provides resilience against both vertical and horizontal loads, while concrete ensures stability and soundproofing—an essential quality for busy office environments. The combination allows architects and engineers to create a structure capable of handling the heavy demands of continuous use while maintaining elegance in design.

This system also supports large open floor plans, allowing the high-rise building to provide customizable workspaces. Businesses can adapt layouts to match modern work trends, from open collaborative zones to private executive suites. The building’s vertical design emphasizes efficiency, with streamlined circulation systems including high-speed elevators and intelligent traffic flow management.

Functionality for Modern Business

The high-rise building is designed with businesses’ future needs in mind. Modern companies require more than just physical space; they need adaptable environments that enhance productivity and foster collaboration. With advanced infrastructure for digital connectivity, energy-efficient systems, and environmental sustainability measures, this development positions itself as a leading workplace destination in Shanghai.

The inclusion of co-working spaces, conference centers, and leisure zones within the building reflects the growing emphasis on holistic high-rise building design. By combining professional work environments with areas for networking, relaxation, and creative engagement, the building fosters a balance between productivity and employee well-being.

Integration of Sustainability

In an era where environmental responsibility is at the forefront of global development, this high-rise building serves as a model of how modern architecture can seamlessly integrate sustainability into large-scale urban projects. Every stage of the design and construction process has been guided by principles of efficiency, conservation, and long-term resilience, ensuring that the building not only meets the immediate needs of its occupants but also contributes positively to Shanghai’s broader environmental goals.

To minimize its ecological footprint, the project incorporates a wide range of green building technologies. Advanced energy-efficient lighting systems reduce electricity consumption, while intelligent HVAC (heating, ventilation, and air conditioning) solutions ensure that energy use is optimized without compromising comfort. Complementing these systems, water-saving technologies such as low-flow fixtures, rainwater collection, and greywater recycling contribute to resource conservation while significantly lowering operational costs over time.

The architectural design itself plays a crucial role in promoting sustainability. The strategic inclusion of natural lighting and ventilation reduces reliance on artificial systems, creating a healthier and more pleasant indoor environment. Large windows, optimized building orientation, and open interior layouts allow sunlight to penetrate deep into workspaces, while engineered airflow systems enhance air quality, reducing the need for excessive mechanical ventilation. This thoughtful approach not only improves energy efficiency but also enhances employee well-being and productivity.

A particularly noteworthy feature is the 50,000㎡ basement area, which has been carefully planned as the backbone of the building’s sustainable infrastructure. Beyond serving as a hub for utilities, it houses waste management facilities designed to support recycling and responsible disposal practices. In addition, the basement integrates underground green technologies, such as geothermal energy systems and energy storage facilities, further reducing dependence on non-renewable resources. By concentrating these systems underground, valuable above-ground space is preserved for functional and aesthetic purposes while ensuring the building operates with minimal environmental disruption.

Collectively, these measures align with Shanghai’s ambitious vision of becoming a global leader in eco-friendly urban development. The project demonstrates how large-scale commercial buildings can achieve operational efficiency, reduce carbon footprints, and create healthier environments without sacrificing modern design or functionality. More than just an office building, it stands as a future-ready urban landmark, setting a precedent for the next generation of sustainable architecture in China.

Role in Shanghai’s Business Landscape

Upon completion in 2025, this high-rise building will become a vital part of Shanghai’s commercial and financial fabric. The city continues to attract multinational corporations, and developments of this scale ensure that there is sufficient infrastructure to support economic growth.

By offering premium office spaces with modern amenities, the building enhances Shanghai’s reputation as a business hub not only within China but also globally. It will serve as a workplace for thousands of professionals while also providing cultural and commercial spaces that extend its influence beyond the corporate world.

Symbol of Progress and Innovation

This high-rise building project is not only about creating a physical space but also about embodying Shanghai’s spirit of innovation and progress. The scale of the development, combined with advanced structural design and sustainable practices, makes it a benchmark for future high-rise buildings across the region.

By integrating 201,600㎡ of functional space, with 151,600㎡ above ground and 50,000㎡ underground, the building demonstrates how large-scale projects can balance efficiency, sustainability, and elegance. Its completion in 2025 will mark an important milestone in Shanghai’s architectural journey, showcasing the city’s ability to push boundaries in design and engineering.

The Shanghai high-rise building project stands as a testament to modern architectural vision, engineering excellence, and the evolving needs of global business. With its massive 201,600㎡ total area, innovative steel structure concrete high-rise system, and careful attention to sustainability, it reflects the future of workplace environments. Scheduled for completion in 2025, this high-rise building will not only provide world-class commercial space but also symbolize Shanghai’s role as a global leader in business innovation and architectural achievement.