1. Which scenarios are suitable for steel structure pedestrian overpass bridges and corridors?
1.1 Urban transportation hub (subway entrance, high-speed rail station connection)
- Structural advantages: It uses box-section steel trusses with a single span of up to 30 meters, realizing a column-free passage space, avoiding columns blocking the line of sight, and improving the efficiency of crowd control.
- Construction efficiency: The rate of prefabricated modular components in the factory reaches 90%, and the on-site assembly period is 50% shorter than that of traditional concrete. The main structure of the 200-meter pedestrian overpass can be completed in only 45 days, reducing the impact on urban traffic.
- Functional design: Equipped with anti-slip and wear-resistant steel pedals (load ≥5kN/㎡), an intelligent lighting system, and barrier-free ramps to meet the passage needs of passengers carrying luggage.
- Design highlights: Streamlined skybridges, such as curved and zigzag shapes, can be designed, matched with glass curtain walls or perforated aluminum plate surfaces, such as the “crystal necklace” shape of the Shanghai Lujiazui Ring Corridor, which has become a city landmark.
- Cost reference: The unit cost is about $600-800 USD/㎡, and the comprehensive cost is 20% lower than the concrete solution.
1.2 Commercial complex corridor (shopping mall, office building, aerial connection)
- Spatial integration: The steel structure corridor designed based on BIM technology can realize the vertical linkage of the upper and lower commercial spaces. The main construction period of the corridor below 6 floors only takes 30 days, and it integrates sunshades, advertising screens, and air-conditioning systems.
- Flexible expansion: Modular interfaces support later expansion. For example, the Shenzhen MixC corridor uses the “dismantle and build” technology to complete the connection of new cross-street corridors during business hours without affecting merchant operations.
- Load-bearing performance: Adopting GB, EN, and AISC design specifications and using Q355B S355JR A572 SM490A high-strength steel, the floor load reaches 3.5kN/m², which can meet the needs of dense crowds and temporary promotional activities.
- Aesthetic design: Special-shaped steel components are cut through CNC to achieve curved and spiral shapes, such as the wavy roof of the “Sky Link” corridor in Chengdu Taikoo Li, which is combined with light-transmitting soft membranes to create a transparent space.
- Cost reference: unit cost is $700-900 USD/㎡, suitable for high-end commercial districts.
1.3 Scenic area/park landscape corridor (ecological trail, viewing bridge)
- Eco-friendly: The steel structure is lightweight (only 1/3 of concrete), which reduces damage to the terrain; it uses hot-dip galvanizing anti-corrosion technology, with a maintenance-free period of 20 years, reducing interference with the natural environment.
- Various shapes: special structures such as suspension bridges and cable-stayed bridges can be designed. For example, the Zhangjiajie Glass Scenic Skybridge uses a steel structure frame + full glass panels to achieve a “floating in the air” viewing effect.
- Safety guarantee: Wind resistance level 10, earthquake resistance level 7, equipped with anti-collision guardrails and emergency evacuation passages, and certified by GB, EN, and AISC design specifications for steel structure design.
- Environmental protection features: Steel is 100% recyclable, construction waste is reduced by 85%, and carbon emissions are 60% lower than concrete, which is in line with the green construction concept of the scenic area.
- Cost reference: unit cost $550-750 USD/㎡, suitable for nature reserves and tourist attractions.

2. Why do global cities prefer steel structure overpass bridges and corridors?
2.1 Rapid construction to reduce urban disturbance
- Factory prefabrication + on-site hoisting mode: The main structure of a 100-meter pedestrian overpass can be completed in just 30 days, which is 75% shorter than traditional concrete pouring (120 days), avoiding long-term road occupation for construction.
- Nighttime rapid assembly technology: Using modular pre-assembly, key nodes can be hoisted within 8 hours at night, minimizing the impact on daytime traffic.
2.2 Freedom of shape, defining urban aesthetics
- The high plasticity of steel supports complex geometric forms, such as the double helix structure of the “Aerial Silk Road” corridor in Beijing’s Shougang Park, which enables a dialogue between architecture and industrial heritage sites through parametric modeling.
- Diversity of surface materials: It can be matched with perforated aluminum panels, carbon fiber panels, green curtain walls, etc., such as the vertical greening system of Singapore’s “Super Tree” corridor, to achieve the integration of architecture and nature.
2.3 Safe and durable, full-cycle guarantee
- High-strength steel: The main structure adopts Q355B S355JR A572 SM490A high-strength steel with a tensile strength of ≥390MPa, which increases the safety factor by 30% compared with traditional concrete structures.
- Intelligent monitoring system: Integrates strain sensors and displacement meters to monitor bridge vibration and displacement data in real time. For example, the Internet of Things monitoring platform of the Guangzhou Tower Pedestrian overpass Bridge can provide early warning of structural abnormalities.
2.4 Green and sustainable, in line with ESG goals
- Photovoltaic integrated design: Photovoltaic glass (BIPV system) can be laid on the top of the overpass, and the annual power generation can cover 50% of the lighting electricity. For example, the Shanghai Hongqiao Hub Photovoltaic Corridor reduces CO2 emissions by about 20 tons per year.
- Detachable modular structure: The component reuse rate exceeds 80%. When the urban planning is adjusted, the steel structure overpass can be moved to a new location as a whole to reduce demolition waste.

3. Application scenarios and technical solutions for Footbridge
| Scene Type | Technical Solution | Core Performance | Cost reference |
| Main road overpass | Steel truss + glass railing | Single span 25 meters, crowd load 3.5kN/㎡, wind resistance 10 | $650-850 USD/㎡ |
| Commercial Sky Corridor | Steel frame + aluminum alloy ceiling | Span 18 meters, sound insulation ≥ 40dB, equipped with an air conditioning system | $750-950 USD/㎡ |
| Scenic viewing suspension bridge | Cable suspension structure + anticorrosive wood panel | Span 80 meters, wind resistance 12, load 2.5kN/㎡ | $800-1000 USD/㎡ |
| Campus/Hospital Corridor | Light steel frame + awning | Span 12 meters, construction period 20 days, barrier-free design | $500-700 USD/㎡ |
4. Steel Structure pedestrian overpass bridge vs. Traditional Concrete: In-depth Comparison
| Core indicators | Steel structure scheme | Traditional concrete solution |
| Maximum span of a single span | 30 meters (without columns) | ≤15 meters (pillars required) |
| 100m construction period | 30 days to complete the main construction | 120 days (including maintenance) |
| Structural deadweight | 300-500kg/㎡ | 1500-2000kg/㎡ |
| Styling flexibility | Can realize complex shapes such as curved surfaces and cantilevers | Depends on templates, limited form |
| Carbon emissions | 0.8tCO₂/㎡ (60% reduction) | 2.0tCO₂/㎡ |
| Renovation cost | Component replacement costs are 50% lower | High cost of demolition and reconstruction |
5. Key Components and Technical Standards
Load-bearing system
- Steel box girder: Made of high-strength steel, with a cross-section height of 800-1200mm and a bending stiffness of 1.5×10^6N・m², it can meet the load-bearing requirements of large spans.
- Steel tube truss: triangular grid system, the rods only bear axial force, and the material strength utilization rate reaches 95%, which is suitable for large-span scenes such as observation decks.
- Earthquake-resistant bearing: Equipped with spherical steel bearing or elastic sliding plate bearing, it can withstand horizontal earthquake force of 1.2kN/㎡, and displacement deformation ≤50mm.
Enclosure and decoration system
- Anti-slip pedal: hot-dip galvanized steel grating (toothed surface), friction coefficient ≥ 0.6, safe for travel in rainy and snowy weather.
- Noise barrier: double-layer color steel sandwich panel (filled with 100mm rock wool), sound insulation ≥35dB, suitable for busy traffic sections.
- Smart lighting: LED linear lights are combined with solar photovoltaic panels, with an illumination of ≥300lux and energy consumption reduced by 60% compared to traditional lamps.
6. Frequently Asked Questions
Q1. Is the steel structure pedestrian overpass bridge safe? How is the wind and earthquake resistance?
A: The steel structure pedestrian overpass bridge adopts high-strength steel and scientific structural design, and the safety level reaches level 1. The main structure uses Q355B S355JR A572 SM490A steel (compressive strength 345MPa), the wind resistance level can reach 10-12 (typhoon support is configured in coastal areas), and the seismic fortification intensity is 7-8 degrees, which meets the seismic specifications. For example, the Shenzhen Bay Port steel structure bridge has been optimized through wind tunnel tests and can withstand a level 12 typhoon (wind speed 32.7m/s), and is equipped with a full-process stress monitoring system to ensure structural safety in real time.
Q2. How long is the construction period of the steel structure corridor? Will it affect traffic?
A: The steel structure corridor adopts factory prefabrication + on-site assembly mode, and the construction period is shortened by 50%-70% compared with traditional concrete. Taking a 100-meter corridor as an example, the main structure only takes 25 days to complete, and 90% of the components are processed in the factory. Only hoisting and splicing are required on-site. Night construction or segmented closure can be adopted to minimize the impact on ground traffic. For example, the Beijing World Trade Corridor uses weekend nights to complete hoisting and achieve “zero daytime road closure” construction.
Q3. Is the later maintenance cost of a steel structure pedestrian overpass high? How to prevent corrosion and rust?
A: The annual maintenance cost of a steel pedestrian overpass is about 3%–5% of the initial cost, covering coating renewal every 10 years and inspections. With hot-dip galvanizing (≥85μm) plus fluorocarbon paint, the maintenance-free period reaches 20 years; coastal areas may add epoxy primer, raising frequency by only 20%. Easier to repair than concrete, steel structures cut life cycle costs by 15%–20%.
Q4. Can the steel structure corridor be designed into an arc or a special shape? How to achieve it?
A: Steel structure corridors can achieve diversified shapes through special-shaped steel components and BIM technology. Use parametric modeling to design curved trusses, use CNC cutting equipment to process rods (accuracy ±1mm), and use three-dimensional coordinate positioning and installation on site. For example, the “Yunqiao” corridor in Chengdu Financial City adopts a hyperbolic steel box beam structure. Through segmented pre-assembly and hydraulic lifting technology, it accurately achieves a 270-degree arc suspension effect, combining mechanical properties with visual impact.
| Comparison Dimensions | Traditional construction method | Construction method of steel structure corridor based on BIM and parameterization |
| Design Phase | Two-dimensional drawing design, difficult to adjust the shape, prone to design omissions | Use parametric modeling software such as Rhino to achieve 3D visual design through BIM technology, adjust and optimize in real time to avoid design conflicts |
| Processing and Manufacturing | Manual lofting, manual cutting, low component accuracy (error > 5mm) | CNC cutting equipment processing, the accuracy can reach ±1mm, complex curved surface components can also be accurately formed |
| Installation and construction | On-site rough assembly, relying on experience and judgment, long construction period, large positioning error | 3D coordinate positioning installation, segmented pre-assembly to reduce on-site work, hydraulic lifting, and other technologies to achieve precise installation of complex shapes |
| Complex modeling | Only regular geometric shapes can be completed, and complex curved structures are difficult to construct | It can realize special-shaped structures, such as hyperbolic and arc-shaped structures, such as the 270-degree arc-shaped suspension effect of the “Cloud Bridge” in Chengdu Financial City |
| Quality and efficiency | Much manual intervention, unstable quality, and a long construction period | Digital process control, stable quality, and shortened construction period by 30%-50% |
Q5. How can the steel structure corridor be coordinated with the surrounding architectural style for Overpass bridge? Can the appearance be customized?
A: Steel structure corridors can be customized in material, shape, and style. Commercial areas may use glass curtain walls with metal panels for a modern look; historical blocks can feature wood-grain steel and brick finishes for a retro feel; scenic spots may use bark-textured steel or vine-covered designs. With flexible colors (RAL system) and lighting, they blend seamlessly into any environment.
| Comparison Dimensions | Steel structure corridor construction method | Traditional construction method |
| Material properties | Made of high-strength steel, lightweight, high-strength, easy to transport, and install | Concrete, masonry, and other materials are often used, which are heavy and have high requirements for the foundation. |
| Construction period | Modular prefabricated components, on-site splicing and installation, fast construction speed, and construction period can be shortened by 30%-50% | The on-site pouring and masonry process is complicated, greatly affected by factors such as weather, and the construction period is long |
| Shape and style customization | Style customization can be achieved through surface materials (such as glass curtain walls, metal carved panels, imitation wood grain steel plates, etc.) and shape design, combined with RAL color card full color matching and lighting design, to flexibly adapt to different environments | The shape is limited by materials and craftsmanship, and it is difficult to adjust the style and meet diverse needs. |
| Environmental integration | Can be combined with natural elements (such as bark texture steel plates, vine climbing structures) to achieve organic integration with the environment | When blending with a natural or specific style environment, additional transformation is required, which is more costly. |
| Maintenance costs | Strong corrosion resistance, simple later maintenance, and low maintenance cost during service life | Prone to cracks, weathering, and other problems, frequent maintenance, and high cost |
As a global leader in steel structure solutions, XTD Steel Structure has successfully built more than 50 landmark overpass and corridor projects in cities. Relying on BIM full-process control and modular construction technology, we provide customers with steel structure transportation solutions that are “fast delivery, beautiful and high-performance”, helping to efficiently connect urban spaces and usher in a new era of three-dimensional transportation.