XTD Steel Project Wenchang Cosmodrome in Hainan is China’s “youngest” space launch base, belonging to the Xichang Satellite Launch Center. The launch platform processed and manufactured by XTD Steel Structure has undertaken many well-known space launch missions.
Location: Longlou Town, Wenchang City, Hainan Province Area: covers an area of more than 16,000 mu
At 16:20 on September 6, 2024, Typhoon Capricorn, a Category 17 typhoon, made landfall off the coast of Wenchang, Hainan. When landing, the maximum wind force near the center reached about 62 m/s, and the minimum pressure at the center was about 915 hPa. This is the first time the newly built Hainan commercial space launch site has faced such a powerful typhoon in less than a year.
However, despite the many effects of Typhoon Capricorn, the main structure of the Hainan Wenchang Cosmodrome remained intact, and the main structure of the two launch stations was not damaged. In the aftermath of the typhoon, the aerospace work platforms were able to resume work quickly, minimizing the adverse effects of the typhoon.
The unique advantages of the steel structure working platform, its lightweight, large load capacity, and good durability, enable it to maintain stable working performance under extreme weather conditions and meet the harsh working environment of the Wenchang Commercial Space Launch Site in Hainan. At the beginning of the construction, XTD Steel Structure is well aware of the special status and important mission of the Wenchang Commercial Space Launch Site.
To be selected for the aerospace standards is also the Hainan Wenchang Commercial Space Launch Center’s affirmation of our products; the components used in the factory of this project not only went through the harsh testing and screening work, but we also added additional pre-installation links to reduce the difficulty of the installation construction in the field to ensure that every node can be installed smoothly. We also added a pre-installation section to minimize the installation difficulty on site, ensuring that each nod e could be installed smoothly and allowing time for the valuable launch window.
This Typhoon Capricorn was a test of nature for humanity and a big test for XTD Steel’s products. Our main structure did not suffer any damage, and the protection of the main equipment and facilities remained unharmed after a long period under the devastation of Typhoon Capricorn of 17 magnitude. This shows that XTD Steel’s fabrication team and construction team performed perfectly! XTD Steel’s products were able to withstand the typhoon! In this battle with the typhoon, we also saw the strength and commitment of Suzhou Wujiang XTD Steel Structure Engineering Co., Ltd. with our professional technology and dedication to build an impenetrable steel defense for the Hainan Wenchang Space Launch Complex.
XTD Steel Structure‘s efforts and dedication have won high praise from customers. They have also made significant contributions to the national aerospace industry by Zhuoye. We hope that in the coming days, Hainan Wenchang Cosmodrome will continue to accomplish the splendor of China’s space industry under the guardianship of this steel fortress!