The headquarters project of Suzhou Wujiang XTD Steel Structure marks a major milestone in the company’s journey toward intelligent manufacturing and high-quality industrial transformation. The official foundation laying ceremony for this headquarters project symbolizes not only expansion but also XTD Steel’s strong commitment to innovation, excellence, and sustainable growth in the steel structure industry.
Located in Zhenze Town, the headquarters project involves a total investment of 1.3 billion yuan. Once fully operational, it will achieve an annual output of 50,000 tons of heavy steel assembled structural components and a total annual output value of about 500 million yuan. This ambitious project will play a key role in strengthening the regional industrial chain, driving efficiency, and supporting Zhenze’s economic transformation toward Industry 3.0.
During the groundbreaking ceremony, key leaders including Dong Jianhua, Zhang Chunming, Dong Bin, Gu Quan, Shen Junxia, Zhou Gongbiao, Qiu Jianzhong, and Jiang Zhixiang jointly laid the foundation stone for the headquarters project, marking the official launch of construction.

Building a Smart Industrial Base for the Future
Founded in 2002, Wujiang XTD Steel Structure Engineering Co., Ltd. has been rooted in Zhenze for over 20 years. The company now employs more than 200 skilled professionals and maintains an annual steel production capacity exceeding 80,000 tons.
Over the past two decades, XTD Steel has earned a reputation as one of China’s first-class certified enterprises for national steel structure professional contracting—continuously ranking among the country’s most reliable structural engineering providers.

The newly launched headquarters project covers a building area of approximately 21,000 square meters with a total investment of 130 million yuan. Equipped with a fully intelligent and automated steel structure production line, the project includes three heavy steel processing lines, one light steel line, and one large-scale modular structure line. These advanced facilities will significantly improve production accuracy, product consistency, and construction efficiency, setting new standards for intelligent prefabrication in China’s steel sector.
To align with national sustainable development goals, XTD Steel integrates digital monitoring, energy-efficient systems, and green construction technologies into the headquarters project. These innovations are expected to reduce production energy consumption by more than 20% and improve resource utilization across all manufacturing stages.

Driving Industrial Upgrading and Regional Collaboration
Once completed, the headquarters project will not only serve as the company’s management and R&D center but also as a comprehensive industrial base integrating design, fabrication, logistics, and innovation. It will support the collaborative development of upstream and downstream enterprises within the Zhenze steel ecosystem, reinforcing Suzhou’s leadership in smart construction and sustainable industry.
According to China Construction News, similar intelligent manufacturing bases have proven to accelerate the modernization of China’s steel structure sector. XTD Steel’s new headquarters project follows this national direction, promoting green transformation and high-value manufacturing.
In addition, XTD Steel actively cooperates with the China Steel Structure Association to align its R&D and production standards with the latest technological guidelines and safety benchmarks. This partnership strengthens XTD Steel’s position as an industry benchmark for structural quality and intelligent engineering.

Committed to Innovation, Quality, and National Development
Since its establishment, XTD Steel Structure has remained committed to providing world-class steel structure engineering solutions for domestic and international markets.
From large-scale infrastructure such as the Hainan International Commercial Space Launch Center and Luoyang Expressway Toll Station to urban projects like Foshan Metro Line 2 and the Suzhou Central Fragrant Tunnel, XTD’s engineering excellence speaks through every completed headquarters project and industrial facility.
These landmark achievements highlight the company’s ability to integrate advanced design, precision fabrication, and on-site construction into a unified engineering system.
As XTD Steel continues to expand, the Phase II headquarters project serves as a strong foundation for future innovation—empowering the company to lead the evolution of intelligent manufacturing, promote green development, and contribute to China’s national industrial modernization.