Football is the world’s most popular and influential sport. Qatar was the first Middle Eastern country to host the 2022 FIFA World Cup. They had the huge challenge of building the tournament venues from the ground up. Therefore, the Qatari government has invested approximately US$6.5 billion in the construction of a number of sports venues (such as Lusail Stadium and Stadium 974) that meet modern aesthetic standards and are both innovative and durable. To cope with high altitudes and desert climates, they adopted steel structures building for construction based on considerations of sustainability, modularity, and cost-effectiveness. This made sure the tournament could be hosted successfully.
The Cost-effectiveness of the Modular Steel Structures Building in Qatar
The 2022 FIFA World Cup in Qatar has driven innovative practices in the cost-effectiveness of stadium construction. Qatar’s lack of modern stadium infrastructure and the need to accommodate 1.5 million fans presented a huge challenge. It adopted a modular steel structure system to build 8 modern football stadiums within a limited time, which undoubtedly represents a miracle. When we examined it in detail, we found that it originated from the revolutionary advantages of modular steel structures building: fast construction speed, high flexibility, and cost-effectiveness.
Stadium 974 is a great example of this. It shows how modular steel structures building can be used to build big events. The venue was built from 974 recycled shipping containers and a steel frame, and its completely demountable and reusable design significantly improves cost-effectiveness. By using prefabricated components, the stadium can be quickly assembled off-site and installed on-site, reducing on-site labor by up to 30% compared to traditional concrete construction. This method saves time and money. It reduces the cost of getting the site ready and the need for heavy equipment during construction, reducing the total construction budget.
In addition, these benefits do not end with the competition. After the FIFA World Cup, the steel components will be dismantled but can still be used for other projects, avoiding costly maintenance, demolition, and disposal costs. This is key evidence of the cost-effectiveness of modular steel structures building.
The Manifestation of Cost-Effectiveness in the Corrosion Issue
Since Qatar is located on the coast and has a hot, humid climate, local buildings have always had to deal with corrosion. This means that steel used in sports venues is prone to rusting rapidly due to the high humidity and salt content in the air. So, Qatar had to up its budget and use corrosion-resistant steel in big sports venues like Al Bayt Stadium to deal with this issue.

Common corrosion-resistant steels include stainless steel, hot-dip galvanized steel, coated steel, weathering steel, and alloy steel. Although hot-dip galvanized steel and coated steel used in Lusail Stadium increased the initial cost by about 10% to 15%, in the long run, this will avoid expensive maintenance costs in the future. The modular steel structure containers in Stadium 974 use corrosion-resistant steel plates, which means that each part can still be reused after dismantling, greatly saving costs.
This is a simple table illustrating how corrosion-resistant coatings can save costs over the long term:
| Item | Without Coating | With Corrosion Protection |
| Upfront Cost | Lower (but short-term) | 10–15% higher at start |
| Lifespan of Steel Structure | 20–30 years (more repairs) | Over 50 years (less maintenance) |
| Maintenance Cost Over 30 Years | High (frequent repairs) | Low (only occasional checks) |
| Risk of Rust or Damage | Very High | Very Low |
| Long-Term Cost-Effectiveness | Poor | Excellent |
Therefore, although the initial investment may seem costly, spending on corrosion prevention is a wise decision that will save significant costs in the long term and ensure the durability of the steel structures building, thereby proving the cost-effectiveness of steel structures.
Using Steel Structures Building to Resist Strong Desert Winds
The strong desert winds in Qatar often reach speeds of over 40 miles per hour, which poses a significant challenge to the stability of buildings. Steel structures buildings are strong and durable, with secure connections. This makes it so that sports venues can handle strong winds without needing complicated designs or expensive materials.
On the other hand, while adding steel reinforcement can slightly increase costs, it’s essential for preventing structural failure in windy conditions. Concrete cracks when it’s under stress, but steel structures building can bend a lot, so they can handle wind loads better. This means they need less maintenance. This durability makes sure that Qatar’s venues stay safe and operational during the 2022 FIFA World Cup, delivering excellent value for money.
Why Steel Remains a Smart Investment
In the fields of construction and engineering, steel has always performed exceptionally well. First, it is “strong,” meaning it is high in strength yet lightweight. This was perfectly demonstrated in the construction of the stadiums for the 2022 FIFA World Cup: steel, as a raw material, can be used to build structures that are both tall and span large distances (cost-effectiveness) without exerting excessive pressure on the foundation (safety).
In addition to the “strong”, steel has another reassuring characteristic—it is tough and not fragile. Compared to materials that are easily affected by the environment and prone to various problems, steel is like a “tough guy” that remains strong, offering higher safety. Its ductility means that even if a part is damaged, the entire structure is unlikely to collapse.

Steel structures building also have a significant advantage in terms of time savings. The modular and prefabricated processing of steel allows for “building block-style” assembly on-site. This construction method is highly efficient, particularly suitable for projects with tight deadlines and heavy workloads.
In terms of environmental protection, steel also holds its own. It is one of the few steel structures building materials that can be almost perfectly recycled and reused. It does not waste resources or generate excessive construction waste, fully aligning with the principles of “sustainable development.”
Finally, it must be mentioned that steel structure design is very flexible. Whether you want to build an industrial precision workshop or a modern sports stadium, steel can easily adapt to complex design plans. In addition, if you want to renovate or expand in the later stages, it is much easier than traditional materials, providing designers with more choices.
Ready to build smarter?
Ready to build smarter with XTD Steel Structure—where innovation meets reliability. Our team is committed to delivering the same cost-effective, high-performance steel solutions that powered Qatar’s iconic venues, tailored to fit your unique project needs. Whether you’re planning a state-of-the-art factory, a durable bridge, or a stunning sports arena, we’re here to make your vision a reality.

Why Choose XTD Steel Structure?
- Streamlined Production: Our advanced facilities ensure every component is fabricated to exacting standards, so you enjoy faster lead times without compromising quality.
- Robust Workforce: With a dedicated team of skilled professionals, we seamlessly handle projects of any scale—large or small—so you can focus on what matters most.
- Unwavering Quality Assurance: From material selection to final inspection, our rigorous quality protocols guarantee that your structure will stand the test of time.
- Global Standards Compliance: We adhere to internationally recognized certifications, giving you peace of mind that your investment meets—and often exceeds—industry benchmarks.
At XTD Steel Structure, sustainability and adaptability are at the heart of everything we do. Our modular, prefabricated approach not only speeds up installation and reduces on-site labor but also minimizes waste, so you enjoy both cost savings and environmental benefits. Plus, our flexible designs make future expansions and renovations effortless.