Leading Steel Structure Company in China

Product Description

steel structure company

A reliable steel structure company plays a central role in delivering safe, durable, and cost-efficient buildings for industrial, commercial, and public-sector developments. Our engineering team focuses on thoughtful design, material efficiency, and structural performance that adapts to different project environments.

Whether it’s a factory, warehouse, aviation facility, or a large-span workshop, we provide end-to-end support—from design coordination to fabrication and on-site guidance. As a trusted steel structure contractor, we emphasize clear communication, predictable timelines, and optimized construction workflows.

With years of experience handling domestic and international developments, XTD Steel Structure offers project solutions that improve installation speed, reduce long-term maintenance, and deliver consistent performance regardless of scale or complexity.

Steel Structures
Tons/year
0
Our Employees
Persons
0 +
Factory Area
Sqm
0 +

What We Build

We construct industrial workshops, logistics warehouses, production facilities, transit buildings, agricultural structures, commercial halls, and other steel-based systems engineered for stability, usability, and efficient construction across a wide range of project environments.

Terminal Del Aeropuerto

As an industry-leading full-process prefab steel building manufacturer, XTD Steel Structure has ploughed deeply into the field of transportation technology facilities for more than 20 years. Relying on the high-performance characteristics of Q355B S355JR A572 SM490A grade high-strength steel, coupled with continuous technological innovation, XTD Steel Structure reconstructs the space of the aviation hubs and provides global customers with a modernized terminal building system that integrates high efficiency and intelligent green building, from the design of the steel structure, processing, manufacturing, construction, to the subsequent maintenance during the use of the building. We create a modernized terminal building system that is highly efficient, intelligent, and green.

Centro de Exposiciones

In the global exhibition center construction sector, steel structures have emerged as the industry’s preferred solution. As an exhibition center owner, you may currently face the following challenges: traditional concrete buildings typically require 1-2 years of construction time, while pre-booked international convention center might commence as early as next year. You need to strictly control construction budgets while achieving large-span column-free spaces to enhance venue utilization and commercial value. Furthermore, exhibition centers must comply with increasingly stringent green building standards. Steel structure exhibition centers represent the optimal solution to address these pain points. XTD Steel Structure, as a global leader in comprehensive steel construction solutions, delivers modern exhibition center solutions integrating large spans, high flexibility, sustainability, and intelligent features for clients worldwide.

Fábrica De Estructuras De Acero

XTD Steel Structure is a prefabricated steel building manufacturer in the field of modular construction, focusing on providing global customers with full-scenario solutions ranging from 30X50 single-story steel factories to multi-story mega plants stretching over several kilometers. With more than 20 years of deep cultivation in the industry, we have successfully delivered thousands of factories and infrastructures, with a cumulative plant construction area of nearly 10 million square meters, setting a benchmark in the field of steel structure construction.

Gasolineras

As an innovative leader in the field of global steel structure engineering, XTD Steel Structure gathers the industry’s top R&D team to study the special usage scenarios and functional requirements of gas stations in depth, and customizes high-performance and cost-effective prefabricated steel structure gas station solutions for global customers. The steel structure building adopts a modular design concept, which can split the gas station into several standardized and fast-assembling functional modules, which not only significantly shortens the on-site construction period but also effectively reduces the impact of construction on the surrounding environment.

Our Products

Our product range includes rigid steel frames, roof and wall systems, modular components, steel trusses, mezzanine platforms, and architecturally integrated steel structures. Each product is manufactured to support safety, load performance, and long-term structural reliability.

Our Projects

We have contributed to manufacturing complexes, regional logistics hubs, transportation terminals, and specialized workshop expansions—helping clients achieve stronger structures with faster delivery and dependable quality at every stage while adapting to diverse technical requirements.

Our Clients

Awards and Certificates

Frequently Asked Questions

Most companies offer engineering, fabrication, delivery, and installation guidance. As a professional structure steel company, we provide complete support from early planning to final installation.

Yes. Our experience includes light-duty and heavy-duty workshop facilities. Many clients rely on us as their preferred partner for steel structure workshop construction.

Yes. Our experience includes light-duty and heavy-duty workshop facilities. Many clients rely on us as their preferred partner for steel structure workshop construction.

We provide turnkey support as a steel structure contractor, including structural drawings, fabrication documentation, installation guidance, and material coordination.

Through calibrated CNC cutting, automated welding, certified materials, and multi-stage inspections. This ensures every component meets the standards expected from a trusted steel structure company.

Yes. As a global-ready steel structure company in China, we export engineered components with complete technical documentation and secure packaging for overseas transport.

Our structures are engineered according to regional codes for wind, snow, seismic activity, and temperature. This makes them suitable for diverse environments.

Absolutely. We support customization in dimensions, spans, façade options, internal layouts, roof systems, and load requirements.

Blogs

trustworthy steel structure company

Choosing a trustworthy steel structure company is one of the most critical decisions in any construction or industrial project. Steel structure projects involve large budgets,

integrated steel company model

The global construction industry is undergoing a major transformation driven by speed, efficiency, and increasing project complexity. Traditional fragmented delivery models—where design, fabrication, logistics, and

chinese steel construction leadership

Over the past two decades, Chinese steel companies have transformed from domestic suppliers into global leaders in industrial construction. From large-scale factories and logistics hubs

steel workshop importance

In the steel construction industry, the workshop is far more than a production space—it is the operational core that determines quality, efficiency, and delivery reliability.

professional steel company traits

In today’s competitive construction market, selecting the right steel partner is just as important as choosing the right design or location. Steel structure projects demand

steel contractor project management

Modern industrial construction projects demand speed, precision, and coordination across multiple disciplines. Steel contractors are often tasked with delivering large-scale facilities under tight schedules, strict

XTD Steel Structure provides customized prefab steel buildings, covering design, fabrication, and installation. We deliver portal frames, truss systems, workshops, warehouses, and other engineered steel facilities for industrial, commercial, and public projects worldwide.
Copyright © 2025 Suzhou XTD Steel Structure Engineering Co., Ltd.
Location Information
Why Zipcode

Knowing where you plan on building is essential to providing an accurate building estimate.

Search