Leading Steel Structure Manufacturer

Product Description

steel structure manufacturer

Choosing the right steel structure manufacturer plays a major role in the success, efficiency, and long-term reliability of any industrial or commercial building project. Our engineering team focuses on precision fabrication, optimized load performance, and solutions tailored to each client’s operational needs.

As a committed steel structure building manufacturer, we work with advanced production lines that integrate CNC cutting, automated welding, and full-process quality checks. This ensures every component—from rigid frames to workshop structures—is delivered with consistent accuracy and ready for fast installation on-site.

With international project experience, XTD Steel Structure supports developments across manufacturing, logistics, aviation, and infrastructure by supplying durable, cost-effective systems engineered for long-term performance and environmental resilience.

Steel Structures
Tons/year
0
Our Employees
Persons
0 +
Factory Area
Sqm
0 +

What We Build

Our manufacturing scope includes industrial workshops, logistic hubs, factory buildings, aviation hangars, agricultural facilities, and large-span commercial structures. Each solution is engineered with material efficiency, safety, and long-term functionality in mind.

Terminal Del Aeropuerto

As an industry-leading full-process prefab steel building manufacturer, XTD Steel Structure has ploughed deeply into the field of transportation technology facilities for more than 20 years. Relying on the high-performance characteristics of Q355B S355JR A572 SM490A grade high-strength steel, coupled with continuous technological innovation, XTD Steel Structure reconstructs the space of the aviation hubs and provides global customers with a modernized terminal building system that integrates high efficiency and intelligent green building, from the design of the steel structure, processing, manufacturing, construction, to the subsequent maintenance during the use of the building. We create a modernized terminal building system that is highly efficient, intelligent, and green.

Centro de Exposiciones

In the global exhibition center construction sector, steel structures have emerged as the industry’s preferred solution. As an exhibition center owner, you may currently face the following challenges: traditional concrete buildings typically require 1-2 years of construction time, while pre-booked international convention center might commence as early as next year. You need to strictly control construction budgets while achieving large-span column-free spaces to enhance venue utilization and commercial value. Furthermore, exhibition centers must comply with increasingly stringent green building standards. Steel structure exhibition centers represent the optimal solution to address these pain points. XTD Steel Structure, as a global leader in comprehensive steel construction solutions, delivers modern exhibition center solutions integrating large spans, high flexibility, sustainability, and intelligent features for clients worldwide.

Fábrica De Estructuras De Acero

XTD Steel Structure is a prefabricated steel building manufacturer in the field of modular construction, focusing on providing global customers with full-scenario solutions ranging from 30X50 single-story steel factories to multi-story mega plants stretching over several kilometers. With more than 20 years of deep cultivation in the industry, we have successfully delivered thousands of factories and infrastructures, with a cumulative plant construction area of nearly 10 million square meters, setting a benchmark in the field of steel structure construction.

Gasolineras

As an innovative leader in the field of global steel structure engineering, XTD Steel Structure gathers the industry’s top R&D team to study the special usage scenarios and functional requirements of gas stations in depth, and customizes high-performance and cost-effective prefabricated steel structure gas station solutions for global customers. The steel structure building adopts a modular design concept, which can split the gas station into several standardized and fast-assembling functional modules, which not only significantly shortens the on-site construction period but also effectively reduces the impact of construction on the surrounding environment.

Our Products

We provide rigid steel frames, modular components, steel trusses, workshop systems, architectural steelwork, and custom assemblies. Every product is designed to optimize structural stability, reduce erection time, and adapt to complex project requirements.

Our Projects

Over the past years, XTD Steel Structure has supplied fabricated systems for port terminals, industrial expansion projects, national logistics parks, airport upgrades, and large-scale factory constructions—delivering reliable results across diverse environments.

Our Clients

Awards and Certificates

Frequently Asked Questions

Reliability depends on engineering capabilities, production technology, inspection standards, and material traceability. A strong steel structure manufacturer ensures consistent performance across every component.

Yes. Our experience as a steel structure workshop manufacturer includes single-span and multi-bay workshops, heavy-duty production halls, and facilities requiring overhead cranes or specialized equipment layouts.

Yes. Our experience as a steel structure workshop manufacturer includes single-span and multi-bay workshops, heavy-duty production halls, and facilities requiring overhead cranes or specialized equipment layouts.

Absolutely. As a seasoned prefab steel structure manufacturer, we supply modular systems that reduce on-site labor, speed up installation, and maintain high dimensional accuracy.

XTD Steel Structure combine automated welding, calibrated CNC machinery, continuous inspection, and certified materials. These standards allow us to operate as a dependable fabricated steel structure manufacturer.

Yes. As a china steel structure manufacturer with global experience, we support overseas clients with engineered components, technical drawings, and structured packaging for easy installation.

Our buildings are engineered for region-specific loads, including wind, snow, seismic activity, and temperature fluctuations. Each steel structure building manufacturer solution is tailored accordingly.

Logistics, manufacturing, aviation, agricultural processing, warehousing, and retail distribution all rely on systems produced by modern steel structure manufacturers.

Blogs

steel manufacturing raw material sourcing

In modern industrial production, the strength and reliability of steel structures begin long before fabrication starts. The foundation lies in how raw materials are selected,

steel manufacturer engineering review

Before a single steel plate is cut or a weld is laid down, a structured engineering evaluation must take place. In modern industrial construction, the

steel manufacturing capacity planning

In today’s highly competitive construction and infrastructure market, steel manufacturing capacity planning plays a decisive role in determining whether projects are delivered on time, within

chinese steel overseas projects

As global infrastructure demand continues to rise, chinese steel overseas projects have become a defining force in international construction and industrial development. From Southeast Asia

OEM ODM steel manufacturing

In global industrial supply chains, OEM ODM steel manufacturing has become a strategic solution for brands, contractors, and distributors that want high-quality steel products without

steel manufacturer certification importance

In today’s global construction and manufacturing market, choosing a steel supplier is no longer just about price or production capacity. Compliance, quality assurance, and long-term

steel manufacturing capacity vs quality

In the global steel industry, manufacturers often promote two major strengths: massive production output or superior product quality. But when buyers, contractors, and developers evaluate

steel manufacturer audit

Choosing the right supplier is one of the most critical decisions in any construction or industrial project. A proper steel manufacturer audit helps you verify

chinese steel manufacturer advantages

In today’s global construction market, industrial developers are under constant pressure to reduce costs, shorten delivery timelines, and maintain high quality standards. As a result,

XTD Steel Structure provides customized prefab steel buildings, covering design, fabrication, and installation. We deliver portal frames, truss systems, workshops, warehouses, and other engineered steel facilities for industrial, commercial, and public projects worldwide.
Copyright © 2025 Suzhou XTD Steel Structure Engineering Co., Ltd.
Location Information
Why Zipcode

Knowing where you plan on building is essential to providing an accurate building estimate.

Search